RTK and robotic survey
Utility mapping
Paint fades and flags get pulled. We survey what we locate with high precision RTK and robotic tools and deliver it as a site plan, so the record outlasts the job.

Locate and survey in one visit
Having the same crew locate the utilities and survey them removes a hand-off, and the errors that come with it. What gets drawn is what was actually found on the ground.
We tie the work to site control so it drops straight into your design drawings.
As-builts before backfill
The cheapest time to map a utility is while the trench is open. We survey new installations before they are covered, so the owner has an accurate record and the next locator has something to work from.
Where it is used
What we use it for
01
Design and engineering
Existing utility plans for civil design, servicing and conflict checks.
02
Pre-backfill as-builts
Pipe, conduit and duct bank surveyed in the open trench.
03
Borehole and test pit layout
Locations laid out, cleared and recorded for geotechnical and environmental drilling.
04
Facility mapping
Plant sites, campuses and yards with decades of undocumented services.
05
Municipal projects
Utility mapping to support planning and infrastructure work.
06
Subsurface utility records
A permanent record of locates on sites that will be worked again.

Mapping utilities before backfill 
RTK base set up on site 
Utility mapping survey
What you get
- Site plan in PDF
- CAD drawing files
- Point files and coordinates
- GIS-ready data on request
Common questions
Utility mapping: questions
What is the difference between a locate and utility mapping?
A locate marks the lines on the ground so a crew can dig safely now. Mapping surveys those marks to survey grade and puts them on a plan, so the information is available for design and for every job after this one.
What formats do you deliver?
Typically a PDF site plan and CAD files, with point files or GIS-ready data when the project needs them. Tell us what your designer works in.
Can you survey utilities that someone else located?
Yes, as long as the marks are still clear. We can also re-verify them with our own equipment while we are there.
How accurate is the survey?
RTK GPS and robotic total station work is survey grade. The position of the mark is recorded precisely. The depth and exact position of the buried line carry the normal tolerance of the locating method, and the plan notes how each line was found.